Solar and battery containers for sites that need their own power.

Sentra is an official partner of PT GIDA International Trading Indonesia and supplies GD-MES: a container that combines solar panels, battery storage and controls in one movable package. Designed for commercial and industrial use, including sites without grid power.

Solar Container & Energy Storage

Problems we see in the field

  • Sites with no grid power or an unstable gridCamps, projects and remote areas depend on diesel generators.
  • Generator fuel costs keep recurringDiesel, delivery and engine maintenance pile up month after month.
  • Power cuts disrupt operationsServers, CCTV, networks and key equipment need backup power.
  • Installing panels and batteries separately is complexFoundations, placement and integration often eat time on site.

What we do

Power needs consultation

The load list, hours of use and backup target decide panel and battery capacity.

Procurement of PV and battery containers

GD-MES models from 20 to 270 kWp and batteries up to 520 kWh, per official quotation.

Configuration choice

Container size, panel power, battery capacity, and off-grid or backup needs.

Integration with CCTV and networks

Power for cameras, Starlink and network equipment at your site.

Site planning

Placement, access and light foundation needs follow the manufacturer's guide.

Support after purchase

Technical questions and maintenance are passed on under the manufacturer's terms.

Model options

Eleven configurations from the GIDA brochure. Prices follow the official quotation; request one via WhatsApp.

Container modelSolar panel powerBattery capacity
GD-8GP-P20K20 kWp–
GD-10GP-P40K25 kWp–
GD-20HQ-P70K76 kWp–
GD-20HQ-P110K135 kWp–
GD-40GP-P150K150 kWp–
GD-40HQ-P270K270 kWp–
GD-08GP-P20K/3020 kWp30 kWh
GD-08GP-P25K/6025 kWp60 kWh
GD-20HQ-P80K/26080 kWp260 kWh
GD-40HQ-P190K/260190 kWp260 kWh
GD-40HQ-P200K/520200 kWp520 kWh

From the GIDA brochure. The "KP" figures in the brochure are read as kWp. Battery capacity is not stated for the first six models; availability and configuration follow the official quotation.

How we work

  1. Record electrical loads and hours of use
  2. Determine panel and battery capacity
  3. Choose a configuration and request an official quotation
  4. Delivery, placement and handover
  5. Monitoring and regular maintenance

Frequently asked questions

Can it run without grid power?

According to the manufacturer's brochure, the system can run fully independently (off-grid). Suitability for your load must be calculated from the load list and hours of use.

How long does installation take?

The brochure says no complex foundation is needed. Real time depends on site and model, and is confirmed in the quotation.

How much does it cost?

Price depends on configuration and quantity, and follows the manufacturer's official quotation. Contact Sentra to request one.

Can it run heavy equipment?

It depends on inverter power and battery capacity. Peak load and starting current must be calculated before choosing a model.

What about warranty?

Warranty and after-sales follow the manufacturer's terms and are stated in the quotation.

Need independent power for your site?

Tell us the electrical load, hours of use and location. The first discussion is free.

  • Free first discussion
  • Official manufacturer quotation
  • 20 to 270 kWp of panels
Chat WhatsApp